Conductor Material: The conductor of this series of cables is made of high-purity electrolytic copper with a purity of more than 99.95%. High-purity electrolytic copper has excellent conductivity and high conductivity, which can effectively reduce energy loss during current transmission and improve power transmission efficiency. At the same time, electrolytic copper has good ductility and Flexibility, which is convenient for stranding and other processing during cable production, and can also adapt to different bending angles during laying without breaking. In addition, electrolytic copper has good chemical stability and is not easy to be corroded, which can ensure that the cable maintains good conductivity during long-term use and prolong the service life of the cable.
Insulation Material: The insulation layer of the cable uses Freetox halogen-free material, which is an environmentally friendly insulation material. Compared with traditional halogen-containing insulation materials, Freetox halogen-free materials do not release toxic hydrogen halide gases such as hydrogen chloride when burned, which greatly reduces the harm to humans and the environment in case of fire. At the same time, it has good electrical insulation performance, which can effectively block current and ensure that the insulation resistance and voltage resistance performance of the cable meet the standard requirements. This material also has certain mechanical strength and aging resistance, and can resist external mechanical impact and environmental factors such as temperature changes and ultraviolet radiation, maintaining the stability and integrity of the insulation layer.
Style Design: This series of cables has various structural types such as duplex, triplex and unipolar. A duplex cable is composed of two Insulated Cores, wrapped with a sheath; a triplex cable contains three insulated cores, which are tightly wrapped by a sheath; a unipolar cable has only one insulated core. Different structural designs meet the needs of different circuits. The Multi-Core structure is convenient for transmitting multi-phase current at the same time, reducing the complexity of line laying.
Conductor Stranding: First, high-purity electrolytic copper rods are drawn into copper wires of the required diameter through a wire drawing machine. Then, according to different conductor cross-sectional areas, multiple copper wires are stranded in a certain way. During the stranding process, it is necessary to strictly control the stranding pitch and tension to ensure the roundness and tightness of the conductor, reduce the resistance of the conductor, and improve the conductivity. The Stranded Conductor needs to be surface-treated to remove oil and impurities on the surface to ensure good bonding with the insulation layer.
Insulation Extrusion: Freetox halogen-free insulation material is added to the extruder, heated and melted, and then evenly extruded and coated on the surface of the stranded conductor through a mold to form an insulation layer. During the extrusion process, parameters such as extrusion temperature, speed, and pressure must be precisely controlled. Excessively high temperature will cause the insulation material to decompose, affecting the insulation performance; excessively low temperature will cause defects such as bubbles and material shortage in the insulation layer. The stability of extrusion speed and pressure can ensure uniform thickness of the insulation layer, close bonding with the conductor, and no looseness.
Cabling (Multi-Core Cables): For duplex and triplex cables, it is necessary to cable multiple cores wrapped with insulation layers. During cabling, the cores are stranded together according to a certain stranding direction and pitch, and at the same time, some halogen-free filling materials are filled during the stranding process to make the structure of the cable more round and stable. The filling material is compatible with the insulation material and sheath material and will not have an adverse impact on the performance of the cable.
Sheath Extrusion: After cabling (for unipolar cables, after insulation layer extrusion), sheath extrusion is carried out. Freetox halogen-free sheath material is added to the extruder and extruded and coated on the cabled core or the unipolar insulated core to form a sheath layer. The sheath extrusion process is similar to insulation extrusion, and various parameters need to be strictly controlled to ensure uniform thickness and smooth surface of the sheath, close bonding with the internal structure, and effective protection of the internal core from external mechanical damage and environmental erosion.
Inspection and Testing: Strict inspection and testing are carried out in all links of the production process. The diameter, resistance, and stranding quality of the conductor need to be sampled and tested; the thickness, insulation resistance, voltage resistance performance, and mechanical performance of the insulation layer need to be comprehensively tested; the outer diameter, roundness, and stranding quality of the cabled cable need to be checked; the thickness, appearance, and weather resistance of the sheath layer also need to be inspected. The finished cable also needs to undergo overall performance tests, such as current-carrying capacity test, short-circuit test, and combustion performance test (to verify halogen-free characteristics), to ensure that all performance indicators meet relevant standards and design requirements. Only products that pass all inspections and tests can leave the factory for sale.
Packaging Materials: Cables are usually wound on steel cable reels. Steel cable reels have the characteristics of high strength and high load-bearing capacity, and can bear the weight of the cable and the external force during transportation and handling. The size of the cable reel is determined according to the specification and length of the cable. The length of each reel of 120mm², 150mm², and 185mm² cables is usually 100 meters, 200 meters, or 500 meters. On the cable reel, the cable is tightly wound and wrapped with plastic film, which can effectively prevent the cable from being affected by dust, moisture, and direct sunlight, keeping the cable clean and dry. For some small batches of short cables, wooden box packaging can also be used. Buffer materials such as foam are placed inside the wooden box to avoid damage caused by mutual collision during transportation.
Packaging Marks: Clear packaging marks are printed on the surface of the cable reel or wooden box. The marking content includes product name, model (N2xoh), specification (120mm², 150mm², 185mm²), length, rated voltage (0.6/1kV), structural type (duplex, triplex, unipolar), execution standard, manufacturer, production date, shelf life, etc., which is convenient for users to identify and check during receipt and acceptance. At the same time, some warning signs such as "Do Not Invert", "Handle with Care", "Moisture-proof and Sun-proof", "Keep Away from Fire" are also printed on the packaging to remind transportation and storage personnel to handle the cable correctly and avoid cable damage due to improper operation.
Packaging Requirements: During the packaging process, it is necessary to ensure that the cable is neatly wound on the cable reel without distortion or knotting. The two ends of the cable must be sealed to prevent moisture and impurities from entering the inside of the cable. For cables packaged in wooden boxes, the firmness of the wooden box must be ensured, and the buffer materials inside the box must be filled in place to ensure that the cable does not shake in the box. After packaging, the packaging must be inspected to ensure that the marks are clear and firm and the packaging is intact.
Transportation Methods: This series of cables can be transported by various means such as road transportation, railway transportation, and waterway transportation. Road transportation has the characteristics of high flexibility and can realize door-to-door service, suitable for short-distance transportation and small-batch transportation, and can quickly deliver cables to the destination. Railway transportation has large capacity and relatively low cost, suitable for medium and long-distance transportation and large-batch transportation, especially for cross-regional cargo transportation. Waterway transportation is suitable for long-distance and large-batch transportation, especially for coastal areas or cities with ports, with low transportation costs but relatively long transportation time. When choosing the transportation method, it is necessary to comprehensively consider factors such as the quantity of cables, transportation distance, time requirements, and cost budget, and select the most suitable transportation method.
Transportation Precautions: During transportation, it is necessary to ensure the stability of the cable reel or wooden box to avoid rolling and collision on the transport tool. The cable reel should be placed horizontally, and inversion or tilting is strictly prohibited to prevent the cable from falling off the cable reel or being damaged by extrusion. The compartments and cargo holds of transport vehicles or ships must be kept clean and dry, without sharp objects, corrosive substances, and flammable and explosive items, to avoid mechanical damage or chemical corrosion to the cable. During transportation, measures for moisture-proof, sun-proof, rain-proof, and high-temperature prevention must be taken, such as covering the cable tightly with a tarpaulin to avoid the cable being affected by bad weather. At the same time, traffic rules and transportation regulations must be observed, and transportation routes and time must be reasonably arranged to ensure transportation safety.
Transportation Responsibility: The transporter shall be responsible for the transportation process of the cable. Before transportation, the transporter shall inspect the packaging and quantity of the cable, and sign for receipt after confirmation. During transportation, the goods must be properly stored to ensure that the cable is delivered to the destination safely and intactly. If the cable is damaged, lost, or delayed due to the transporter's reasons, the transporter shall bear the corresponding compensation liability in accordance with the terms of the transportation contract. The shipper shall maintain close communication with the transporter, keep abreast of the transportation status of the goods, and negotiate solutions together in case of abnormal situations.
Delivery Process: After the user places an order, the manufacturer will review the order in a timely manner, and after confirming that the order information (such as specifications, quantity, delivery date, etc.) is correct, arrange production or retrieve the corresponding cable products from the inventory. Before delivery, the manufacturer will conduct a final quality inspection on the cable to ensure that the product meets relevant standards and user requirements. After passing the inspection, the cable is packaged according to the packaging method specified by the user, and relevant delivery documents are prepared, such as product certificate, inspection report, packing list, invoice, etc. Then, contact the transporter to determine the arrangement of transport vehicles or ships, and inform the transporter of the relevant information of the cable (such as model, specification, quantity, transportation method, etc.). When delivering the goods, the manufacturer will notify the user of the delivery information (such as logistics tracking number, estimated arrival time, etc.) to facilitate the user to track the transportation status of the goods.
Delivery Time: For regular specification cables in stock, the manufacturer can usually arrange delivery within 3-5 working days after receiving the user's order and confirming payment. For orders that need to be produced, the delivery time depends on the production progress, and production and delivery are usually completed within 7-15 working days. The manufacturer will make every effort to shorten the production and delivery cycle to ensure that users can receive the goods on time. In case of force majeure factors such as tight supply of raw materials and equipment failure that lead to delayed delivery, the manufacturer will communicate with the user in a timely manner, explain the reason and negotiate to adjust the delivery date.
Sample Provision: To enable users to intuitively understand the quality and performance of this series of cables before purchasing, the manufacturer can provide samples. Users can submit a sample application to the manufacturer, specifying the model, specification, structural type and other information of the required samples. After receiving the sample application, the manufacturer will review it. If the application is approved, the sample will be prepared and sent within 3-5 working days. The samples are of the same specification and performance as the mass-produced products, which can truly reflect the quality level of the products.
Sample Fees: The cost of samples is usually borne by the user, including the production cost, packaging cost and mailing cost of the samples. For long-term cooperative old customers or potential customers with large order intentions, the manufacturer can reduce or exempt part or all of the sample fees according to the actual situation, which can be negotiated with the manufacturer. The sample fee can be paid by bank transfer, online payment and other methods. The manufacturer will arrange the production and delivery of the sample only after the user pays the fee.
Sample Testing Guidance: After receiving the sample, if the user needs to test the sample, the manufacturer can provide relevant testing guidance, such as recommending professional testing institutions, providing testing standards and methods, etc. If the user has questions about the test results, the manufacturer's technical personnel will provide professional explanations and answers.
Quality Guarantee: The manufacturer provides a 2-year quality guarantee period for this series of cables from the date of leaving the factory. During the quality guarantee period, if the cable fails due to its own quality problems (such as conductor breakage, insulation layer breakdown and other non-human factors), the manufacturer will be responsible for free repair or replacement. If the failure is caused by improper use, incorrect installation, man-made damage and other factors, the manufacturer will not assume the free warranty responsibility, but can provide paid maintenance services.
Technical Support: The manufacturer has a professional technical team to provide users with comprehensive technical support. Users can contact the technical personnel through phone, email, online customer service and other channels when encountering technical problems in the process of cable installation, use and maintenance. Technical personnel will answer questions for users in a timely manner and provide professional solutions, such as providing installation drawings, explaining the precautions for use, etc. In addition, the manufacturer will regularly organize technical training courses to help users better understand and use the products.
Complaint Handling: If users have complaints about product quality or after-sales service, they can feedback to the manufacturer through the official complaint channel. The manufacturer will record the complaint content in detail and arrange special personnel to investigate and handle it. The handling result will be fed back to the user within 3 working days. If the complaint is verified, the manufacturer will take corresponding measures to make up for the user's loss, such as replacement, repair, compensation, etc., and summarize the experience and lessons to improve the product quality and service level.
Return and Exchange Policy: If the cable has quality problems that cannot be repaired within the quality guarantee period, or the product received by the user does not conform to the order requirements (such as wrong model, wrong specification, etc.), the user can apply for return or exchange. The manufacturer will verify the situation. After confirmation, it will handle the return or exchange procedures for the user in a timely manner, and bear the corresponding logistics costs. For non-quality problems, such as the user's own reasons for returning or exchanging goods, the user needs to bear the relevant costs and ensure that the product is in an unused and intact state.
Hongtai Cable Technology Co., Ltd
E-mail: export@qlcables.com
sales@qlcables.com
Tel/whatsapp:+86-18032066271
Tambahkan : Zona Pengembangan Industri Xiaokou, Kabupaten Ningjin, Kota Xingtai , Provinsi Hebei, Cina
Hak Cipta © Hongtai Cable Technology Co., Ltd Dukungan Teknis:Teknologi Ronglida
Situs web ini menggunakan cookie untuk memastikan Anda mendapatkan pengalaman terbaik di situs web kami.